Shandong Plant No.1
- Area: 6,000 square meters
- Production Lines: 6
- Equipment:
- 7 Kneading Machines
- 6 Coating Machines
- 2 Rubber Strip Extruders
- 3 Gasket Cutting Machines
- 5 Slitting Machines
- 5 Rewinding Machines
- 2 Packaging Machines
- 4 Die-Cutting Machines
- Annual Production Capacity:
- Butyl Rubber: 8,000 tons
- Waterproof Tape (Roll Material): 1.46 million square meters
- Vibration Damping Sheets: 1 million square meters
- Extruded Rubber Strips: 2 million meters
Shandong Plant No.2
- Area: 24,000 square meters
- Production Lines: 12
- Equipment:
- 12 Kneading Machines
- 14 Coating Machines
- 14 Slitting Machines
- 6 Packaging Machines
- Annual Production Capacity:
- Butyl Rubber: 32,000 tons
- Waterproof Tape (Roll Material): 17.5 million square meters
Malaysia Plant
Area: 803 sqm (square meters)
Production Lines: 2 lines
Equipment Quantity: 10 units
The Malaysia factory is currently undergoing further expansion.
Both factories are equipped with advanced machinery and technology to ensure high-quality production and meet the diverse needs of our clients. Our commitment to innovation and efficiency allows us to deliver reliable and durable products to the global market.